Skip to content

Culture, sports and recreation

$109.6M = +47,862,052 boxes

Pile ≈ 30 m high × 30 m wide × 30 m deep

Tap a line in the table to see its pile.

Budget Facts

2027 budget compared with the 2026 budget

Per 1 box (200 g) = $2.29

Operating budget$8.04B(+4.9%)

Operating

2026 budget → 2027 budget

Montréal 2027 budget line items, in dollars and boxes of KD — Operating (2026 budget → 2027 budget)
Line item2027Change
Administrative services and public safety
Office of the Director General1$5.31M−$275.3K(−4.9%)
Legal affairs2$82.7M+$2.30M(+2.9%)
Comptroller General3Restructured$3.08M−$34.0K(−1.1%)
Finance and property assessment4$88.6M+$2.17M(+2.5%)
Police (SPVM)5$917.4M+$45.4M(+5.2%)
Human resources6Restructured$66.0M−$1.23M(−1.8%)
Fire safety (SIM)7$431.8M+$10.7M(+2.5%)
Office of the Inspector General8$8.20M+$281.9K(+3.6%)
Office of the Auditor General9$8.34M+$281.9K(+3.5%)
Montréal Public Service Commission10$2.97M+$444.4K(+17.6%)
Office de consultation publique de Montréal (public consultation office)11$3.00M+$65.5K(+2.2%)
Montréal agglomeration liaison secretariat12$947.3K+$29.3K(+3.2%)
Development and institutional affairs
Procurement13$37.7M+$23.1K(+0.1%)
Communications and public affairs14Restructured$14.4M−$1.43M(−9.1%)
Economic development15$78.9M−$1.06M(−1.3%)
City Clerk16$37.6M+$1.38M(+3.8%)
Strategic planning, performance and innovation17Restructured$7.27M−$289.4K(−3.8%)
Office of government and international relations and protocol18Restructured$4.90M−$115.7K(−2.3%)
Quality of life
Culture, sports and recreation19Restructured$109.6M−$862.8K(−0.8%)
Diversity and social inclusion20$39.1M−$1.56M(−3.8%)
Environment and ecological transition21Restructured$226.0M+$5.44M(+2.5%)
Space for Life, large parks and Mount Royal22Restructured$120.5M+$932.4K(+0.8%)
Office of the French language23Restructured$552.9K+$100.8K(+22.3%)
Office for addressing homelessness24Restructured$27.8M+$288.6K(+1.1%)
Urban planning, mobility and infrastructure
Electrical Services Commission25$119.4M+$14.0M(+13.3%)
Water26$440.4M+$33.0M(+8.1%)
Building management and planning27$136.7M+$327.7K(+0.2%)
Road network infrastructure28$38.4M−$460.8K(−1.2%)
Real estate strategy and housing29Restructured$308.4M−$825.9K(−0.3%)
Information technology30$156.7M+$12.9M(+9.0%)
Urban planning and mobility31$97.1M+$1.74M(+1.8%)
Executive office – Ville-Marie and borough coordination
Borough coordination and resident services32Restructured$155.3M−$5.34M(−3.3%)
Vehicle fleet and workshops33Restructured$149.5M+$9.28M(+6.6%)
Boroughs
Ahuntsic-Cartierville34$72.5M+$3.28M(+4.7%)
Anjou35$37.0M+$2.73M(+8.0%)
Côte-des-Neiges–Notre-Dame-de-Grâce36$86.5M+$3.27M(+3.9%)
Lachine37$37.0M+$1.77M(+5.0%)
LaSalle38$51.0M+$1.96M(+4.0%)
Le Plateau-Mont-Royal39$70.0M+$3.88M(+5.9%)
Le Sud-Ouest40$72.7M+$3.10M(+4.5%)
L'Île-Bizard–Sainte-Geneviève41$15.9M+$1.28M(+8.7%)
Mercier–Hochelaga-Maisonneuve42$84.3M+$2.45M(+3.0%)
Montréal-Nord43$57.1M+$7.68M(+15.6%)
Outremont44$20.7M+$1.98M(+10.5%)
Pierrefonds-Roxboro45$46.0M+$6.03M(+15.1%)
Rivière-des-Prairies–Pointe-aux-Trembles46$75.6M+$2.61M(+3.6%)
Rosemont–La Petite-Patrie47$84.5M+$5.78M(+7.4%)
Saint-Laurent48$88.9M+$3.57M(+4.2%)
Saint-Léonard49$45.7M+$1.54M(+3.5%)
Verdun50$45.6M+$2.22M(+5.1%)
Ville-Marie51$118.0M−$974.8K(−0.8%)
Villeray–Saint-Michel–Parc-Extension52$73.3M+$2.73M(+3.9%)
Corporate financing expenses
Gross debt service53$1.00B+$10.4M(+1.1%)
Pay-as-you-go capital funding54$711.8M+$161.8M(+29.4%)
Other corporate expenses
Common expenses55$294.9M−$31.2M(−9.6%)
Contributions to organizations56$981.1M+$53.8M(+5.8%)
Elimination of internal and inter-entity transactions57−$53.2M−$1.15M(−2.2%)

Taxes

2026 budget → 2027 budget

Montréal 2027 budget line items, in dollars and boxes of KD — Taxes (2026 budget → 2027 budget)
Line item2027Change
Tax revenue
General property taxes58$3.77B+$149.0M(+4.1%)
Drinking water and wastewater59$597.5M+$68.6M(+13.0%)
Debt service contributions60$222.2M+$4.39M(+2.0%)
911 emergency centre61$16.5M+$528.3K(+3.3%)
Parking lot tax62$37.4M+$2.24M(+6.4%)
Roads tax63$20.6M+$306.2K(+1.5%)
Tax funding the ARTM (regional transit) contribution64$51.4M+$341.9K(+0.7%)
Infrastructure maintenance tax65New$137.7M—
Other66$19.1M+$575.9K(+3.1%)

PDI (capital)

PDI 2026–2035 → PDI 2027–2036 (ten years)

Montréal 2027 budget line items, in dollars and boxes of KD — PDI (capital) (PDI 2026–2035 → PDI 2027–2036 (ten years))
Line itemPDI 2027–2036Change
PDI – Asset categories
Road infrastructure67$5.96B−$732.3M(−10.9%)
Environment and underground infrastructure68$8.20B+$231.6M(+2.9%)
Parks, green spaces and playgrounds69$2.37B−$1.35B(−36.4%)
Buildings and land70$4.69B−$343.3M(−6.8%)
Vehicles71$1.09B−$24.4M(−2.2%)
Furniture and office equipment72$807.4M−$58.2M(−6.7%)
Machinery, specialized tools and equipment73$304.3M−$19.7M(−6.1%)

Amounts are from tabled or adopted budgets. No actual spending is compared with a budget.

Sources

Documents

  1. Total operating budget: A : tableau 2, p. 15 (page 103 du PDF)
  2. 1. Office of the Director General
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 5
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 5): $24.0M. The 2027 budget document restates it at $5.6M to reflect the new structure.
  3. 2. Legal affairs
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 28
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 28): $80.1M. The 2027 budget document restates it at $80.4M to reflect the new structure.
  4. 3. Comptroller General
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  5. 4. Finance and property assessment
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 6
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 6): $86.1M. The 2027 budget document restates it at $86.5M to reflect the new structure.
  6. 5. Police (SPVM)
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 30
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 30): $860.3M. The 2027 budget document restates it at $872.0M to reflect the new structure.
  7. 6. Human resources
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  8. 7. Fire safety (SIM)
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 31
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 31): $419.5M. The 2027 budget document restates it at $421.1M to reflect the new structure.
  9. 8. Office of the Inspector General
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 9
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »
  10. 9. Office of the Auditor General
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 10
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »
  11. 10. Montréal Public Service Commission
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 11
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »
  12. 11. Office de consultation publique de Montréal (public consultation office)
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 12
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »
  13. 12. Montréal agglomeration liaison secretariat
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 13
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »
  14. 13. Procurement
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 16
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 16): $38.2M. The 2027 budget document restates it at $37.7M to reflect the new structure.
  15. 14. Communications and public affairs
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  16. 15. Economic development
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 17
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 17): $78.2M. The 2027 budget document restates it at $80.0M to reflect the new structure.
  17. 16. City Clerk
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 29
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 29): $35.5M. The 2027 budget document restates it at $36.2M to reflect the new structure.
  18. 17. Strategic planning, performance and innovation
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  19. 18. Office of government and international relations and protocol
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  20. 19. Culture, sports and recreation
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  21. 20. Diversity and social inclusion
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 23
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 23): $68.7M. The 2027 budget document restates it at $40.6M to reflect the new structure.
  22. 21. Environment and ecological transition
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  23. 22. Space for Life, large parks and Mount Royal
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  24. 23. Office of the French language
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  25. 24. Office for addressing homelessness
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  26. 25. Electrical Services Commission
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 41
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »
  27. 26. Water
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 42
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 42): $409.2M. The 2027 budget document restates it at $407.4M to reflect the new structure.
  28. 27. Building management and planning
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 43
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 43): $137.9M. The 2027 budget document restates it at $136.3M to reflect the new structure.
  29. 28. Road network infrastructure
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 44
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »
  30. 29. Real estate strategy and housing
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  31. 30. Information technology
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 38
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet SOMM SC, ligne 38): $143.3M. The 2027 budget document restates it at $143.8M to reflect the new structure.
  32. 31. Urban planning and mobility
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet SOMM SC, ligne 45
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »
  33. 32. Borough coordination and resident services
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  34. 33. Vehicle fleet and workshops
    2026: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2026 » (comparatif)
    2027: A : tableau 43, p. 45 (page 133 du PDF), colonne « Budget 2027 »This unit had a different name in the published 2026 budget (D). The 2026 amount is the comparative 2026 budget the city presents in the 2027 budget document.
  35. 34. Ahuntsic-Cartierville
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 5
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet ARR, ligne 5): $69.1M. The 2027 budget document restates it at $69.2M to reflect the new structure.
  36. 35. Anjou
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 6
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »
  37. 36. Côte-des-Neiges–Notre-Dame-de-Grâce
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 7
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet ARR, ligne 7): $82.8M. The 2027 budget document restates it at $83.2M to reflect the new structure.
  38. 37. Lachine
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 8
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »
  39. 38. LaSalle
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 9
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »
  40. 39. Le Plateau-Mont-Royal
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 10
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet ARR, ligne 10): $67.2M. The 2027 budget document restates it at $66.2M to reflect the new structure.
  41. 40. Le Sud-Ouest
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 11
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet ARR, ligne 11): $69.5M. The 2027 budget document restates it at $69.6M to reflect the new structure.
  42. 41. L'Île-Bizard–Sainte-Geneviève
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 12
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »
  43. 42. Mercier–Hochelaga-Maisonneuve
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 13
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet ARR, ligne 13): $81.6M. The 2027 budget document restates it at $81.8M to reflect the new structure.
  44. 43. Montréal-Nord
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 14
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »
  45. 44. Outremont
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 15
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet ARR, ligne 15): $18.9M. The 2027 budget document restates it at $18.8M to reflect the new structure.
  46. 45. Pierrefonds-Roxboro
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 16
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »
  47. 46. Rivière-des-Prairies–Pointe-aux-Trembles
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 17
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet ARR, ligne 17): $72.8M. The 2027 budget document restates it at $73.0M to reflect the new structure.
  48. 47. Rosemont–La Petite-Patrie
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 18
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet ARR, ligne 18): $78.6M. The 2027 budget document restates it at $78.7M to reflect the new structure.
  49. 48. Saint-Laurent
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 19
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »
  50. 49. Saint-Léonard
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 20
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »
  51. 50. Verdun
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 21
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »
  52. 51. Ville-Marie
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 22
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet ARR, ligne 22): $117.5M. The 2027 budget document restates it at $119.0M to reflect the new structure.
  53. 52. Villeray–Saint-Michel–Parc-Extension
    2026: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2026 » (comparatif) ; D : onglet ARR, ligne 23
    2027: A : tableau 44, p. 46 (page 134 du PDF), colonne « Budget 2027 »2026 budget as published (D : onglet ARR, ligne 23): $70.5M. The 2027 budget document restates it at $70.6M to reflect the new structure.
  54. 53. Gross debt service
    2026: A : tableau 2, p. 15 (page 103 du PDF), colonne « Budget 2026 »
    2027: A : tableau 2, p. 15 (page 103 du PDF), colonne « Budget 2027 »
  55. 54. Pay-as-you-go capital funding
    2026: A : tableau 2, p. 15 (page 103 du PDF), colonne « Budget 2026 »
    2027: A : tableau 2, p. 15 (page 103 du PDF), colonne « Budget 2027 »
  56. 55. Common expenses
    2026: A : tableau 2, p. 15 (page 103 du PDF), colonne « Budget 2026 »
    2027: A : tableau 2, p. 15 (page 103 du PDF), colonne « Budget 2027 »
  57. 56. Contributions to organizations
    2026: A : tableau 2, p. 15 (page 103 du PDF), colonne « Budget 2026 »
    2027: A : tableau 2, p. 15 (page 103 du PDF), colonne « Budget 2027 »
  58. 57. Elimination of internal and inter-entity transactions
    2026: A : tableau 2, p. 15 (page 103 du PDF), colonne « Budget 2026 »
    2027: A : tableau 2, p. 15 (page 103 du PDF), colonne « Budget 2027 »Accounting entry that removes services billed between city units so they are not counted twice. Included so the lines add up to the published budget.
  59. 58. General property taxes
    2026: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2026 »
    2027: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2027 »
  60. 59. Drinking water and wastewater
    2026: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2026 »
    2027: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2027 »
  61. 60. Debt service contributions
    2026: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2026 »
    2027: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2027 »
  62. 61. 911 emergency centre
    2026: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2026 »
    2027: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2027 »
  63. 62. Parking lot tax
    2026: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2026 »
    2027: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2027 »
  64. 63. Roads tax
    2026: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2026 »
    2027: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2027 »
  65. 64. Tax funding the ARTM (regional transit) contribution
    2026: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2026 »
    2027: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2027 »
  66. 65. Infrastructure maintenance tax
    2026: Aucun montant en 2026
    2027: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2027 »New tax in 2027.
  67. 66. Other
    2026: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2026 »
    2027: A : tableau 5, p. 19 (page 107 du PDF), colonne « Budget 2027 »
  68. 67. Road infrastructure
    PDI 2026–2035: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2026-2035 »
    PDI 2027–2036: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2027-2036 »PDI-to-PDI comparison: amounts planned over ten years, not annual spending.
  69. 68. Environment and underground infrastructure
    PDI 2026–2035: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2026-2035 »
    PDI 2027–2036: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2027-2036 »PDI-to-PDI comparison: amounts planned over ten years, not annual spending.
  70. 69. Parks, green spaces and playgrounds
    PDI 2026–2035: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2026-2035 »
    PDI 2027–2036: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2027-2036 »PDI-to-PDI comparison: amounts planned over ten years, not annual spending.
  71. 70. Buildings and land
    PDI 2026–2035: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2026-2035 »
    PDI 2027–2036: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2027-2036 »PDI-to-PDI comparison: amounts planned over ten years, not annual spending.
  72. 71. Vehicles
    PDI 2026–2035: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2026-2035 »
    PDI 2027–2036: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2027-2036 »PDI-to-PDI comparison: amounts planned over ten years, not annual spending.
  73. 72. Furniture and office equipment
    PDI 2026–2035: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2026-2035 »
    PDI 2027–2036: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2027-2036 »PDI-to-PDI comparison: amounts planned over ten years, not annual spending.
  74. 73. Machinery, specialized tools and equipment
    PDI 2026–2035: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2026-2035 »
    PDI 2027–2036: A : tableau 94 (section Total), p. 119 (page 209 du PDF), colonne « PDI 2027-2036 »PDI-to-PDI comparison: amounts planned over ten years, not annual spending.